All of the application documents are available to download below.
General
- Draft Planning Statement
- Draft Design and Access Statement
- Draft Construction Environmental Management Plan
- Draft Construction Environmental Management Plan – Appendix A Site Layout
- Draft Construction Environmental Management Plan – Appendix B WMP Final
- Draft Construction Environmental Management Plan – Appendix C Method Statement – Reptiles
- Draft Construction Environmental Management Plan – Appendix D Method Statement – Generic
- Acceptance of Notification (English & Cymraeg)
- Application for permission for a Development of National Significance (DRAFT)
- Site and Newspaper Notice
- Statutory Consultee Notice
- Project Benefits Statement
- Interim Consultation Report
- Interim Consultation Report – Appendices
- Photomontages (Viewpoints)
Draft Environmental Statement – Non Technical Summary (Volume 1)
Draft Environmental Statement – Main text (Volume 2)
- Chapter 1 – Introduction
- Chapter 2 – Approach
- Chapter 3 – Scheme Need, Alternatives and Iterative Design Process
- Chapter 4 – Description of the Proposed Development
- Chapter 5 – Legislative and Policy Overview
- Chapter 6 – Landscape and Visual Impact Assessment
- Chapter 7 – Historic Environment
- Chapter 8 – Biodiversity
- Chapter 9 – Ornithology
- Chapter 10 – Water Environment
- Chapter 11 – Ground Conditions
- Chapter 12 – Traffic and Transport
- Chapter 13 – Noise
- Chapter 14 – Aviation and Telecommunications
- Chapter 15 – Shadow Flicker
- Chapter 16 – Socio Economics including Tourism and Recreation
- Chapter 17 – Inter-related Cumulative Effects
Draft Environmental Statement – Figures (Volume 3)
- Figure 1.1 Site location
- Figure 1.2 Site layout
- Figure 3.1 Typical wind turbine
- Figure 4.1 Site layout western and eastern extent
- Figure 4.2 Site access
- Figure 4.3 Proposed grid connection corridor
- Figure 4.4 Typical wind turbine foundation
- Figure 4.5 Typical wind turbine crane hardstanding
- Figure 4.6 Typical internal site track cross section
- Figure 4.7 Typical cable trench details
- Figure 4.8 Typical switchroom and substation compound
- Figure 4.9 Substation building elevations
- Figure 4.10 Project programme (planning only)
- Figure 6.1 Landscape and visual study area
- Figure 6.2 Zone of Theoretical Visibility (ZTV) to Blade Tip with viewpoint locations within the Study Area
- Figure 6.3 Zone of Theoretical Visibility (ZTV) to hub height with viewpoint locations within the Study Area
- Figure 6.4 Wind energy developments included in the Cumulative Landscape and Visual Impact Assessment (CLVIA)
- Figure 6.5 Landform plan of the study area
- Figure 6.6 National Landscape Character Areas with Zone of Theoretical Visibility (ZTV) to hub height and blade tip within the Study Area
- Figure 6.7 Host LANDMAP Geological Landscape Aspect Areas with Zone of Theoretical Visibility (ZTV) to Hub and Blade Tip
- Figure 6.8 LANDMAP: Landscape Habitats Aspect Areas filtered into the Study Area with Zone of Theoretical Visibility (ZTV) to Hub and Blade Tip
- Figure 6.9 LANDMAP: Visual and Sensory Aspect Areas filtered into the Study Area with Zone of Theoretical Visibility (ZTV) to Hub and Blade Tip
- Figure 6.10 LANDMAP: Historic Landscape Aspect Areas filtered into the Study Area with Zone of Theoretical Visibility (ZTV) to Hub and Blade Tip
- Figure 6.11 LANDMAP: Cultural Landscape Services Aspect Areas filtered into the Study Area with Zone of Theoretical Visibility (ZTV) to Hub and Blade Tip
- Figure 6.12 National Landscape Designations with Zone of Theoretical Visibility (ZTV) to hub height and blade tip within the study area
- Figure 6.13 Brecon Beacons National Park Landscape Character Assessment: Landscape Character Areas within the Study Area
- Figure 6.14 Local Landscape Designations with Zone of Theoretical Visibility (ZTV) to Hub and Blade Tip within 10km of the proposed turbines
- Figure 6.15 Residential properties within 2km with Zone of Theoretical Visibility (ZTV) to Blade Tip
- Figure 6.16 Key recreational routes with viewpoint locations within 15 km of the proposed turbines
- Figure 6.17 Key recreational routes beyond 15 km of the proposed turbines
- Figure 6.18 Key recreational area with viewpoint locations within 15 km of the proposed turbines
- Figure 6.19 Key recreational areas with viewpoint locations beyond 15 km of the proposed turbines
- Figure 6.20 Cumulative Zones of Theoretical Visibility in relation to West of Rhiwfelin Farm and Llwynceleyn Farm wind turbines
- Figure 6.21 Cumulative Zones of Theoretical Visibility in relation to Group 1 and Twyn Hywel wind farms
- Figure 6.22 Cumulative Zones of Theoretical Visibility in relation to Ferndale and Group 2 wind farms
- Figure 7.1 HER data
- Figure 7.2 Designated assets
- Figure 8.1 Statutory sites
- Figure 8.2 Non-statutory sites
- Figure 8.3 Extended Phase 1
- Figure 8.4 Extended Phase 1 – detailed
- Figure 10.1a Wind farm development – site layout
- Figure 10b+10.1c Proposed development location and study area
- Figure 10.2 Water features
- Figure 10.3 NRW Flood Maps for Planning
- Figure 10.4 Development Advice Map (Flood Zones B, C1 and C2)
- Figure 10.5 Flood Risk Assessment Wales map
- Figure 10.6 Flood Risk Assessment Wales map – Flood Risk reservoirs
- Figure 10.7 Hydrological receptors
- Figure 13.1 Noise sensitive receptors and monitoring locations
- Figure 15.1 Shadow flicker study area
- Figure 15.2 Shadow flicker contours
- Figure 16.1 Existing Public Rights of Way across the site
- Figure 16.2 200m buffers from proposed turbines in relation to Public Rights of Way
- Figure 16.3 Potential changes to Public Rights of Way
Draft Environmental Statement – Appendices (Volume 4)
- Appendix 1A – Merged Scoping Report
- Appendix 1B – Merged Scoping Direction
- Appendix 2A – Carbon balance
- Appendix 6A – LVIA Methodology
- Appendix 6B – LANDMAP Filtering Process
- Appendix 6C – LANDMAP Baseline Descriptions and Sensitivity Assessments
- Appendix 6D – LANDMAP Landscape Habitats Aspect Areas Assessment of effects
- Appendix 6E – LANDMAP Visual and Sensory Aspect Areas Assessment of effects
- Appendix 6F – LANDMAP Historic Landscape Aspect Areas Assessment of effects
- Appendix 6G – LANDMAP Cultural Landscape Services Aspect Areas Assessment of effects
- Appendix 6H – Assessment of Landscape Effects_BBNP_LCAs
- Appendix 6I – Viewpoint Analysis
- Appendix 7A – Historic Environment Desk-Based Assessment
- Appendix 7B – Historic Environment Gazetteer
- Appendix 7C – Written Scheme of Investigation
- Appendix 7D – Stage 1 Setting
- Appendix 7E – Assessment of the Significance of Impacts of Development on Historic Landscape
- Appendix 8A – PEA
- Appendix 8B – Bat Report
- Appendix 8C – Reptile Report
- Appendix 8D – Watervole Report
- Appendix 8E – Dormouse Report
- Appendix 8F – Biodiversity Scoping
- Appendix 9A – Baseline Bird Report
- Appendix 9B – CRM Report
- Appendix 9C – Scoping Table
- Appendix 10A – Draft Flood Consequences Assessment
- Appendix 10B – Surface Water Quality Data
- Appendix 10C – Site Visit Photos
- Appendix 10D – WFD Assessment
- Appendix 11A – Geoenvironmental Phase 1
- Appendix 12A – AIL Final
- Appendix 12B – Construction Traffic Management Plan
- Appendix 12C – Accident Data
- Appendix 14A – Aviation Review
- Appendix 14A – Telecommunications Mynydd y Glyn
- Appendix 15A – Detailed Shadow Flicker Results